- From:
- Ryan Ragaza-Bourassa
- To:
- Al French; Alex McGregor ; Amy Slay; Austin, Josh ; B Vasquez; bdafarmer@gmail.com; Beau Duff; Ben Buchholtz; Bennett,Brett; Biggs, Jason; Bill Wolff; Bob Murtha (mdaud@mdplusa.com); Bobbie Ryder; Bobby Baker; Booth, Darrell; Bowker, Amber M.; Brandi Colyar; Baldwin, Bruce; Bruce Carswell; Bryson Bennett; BudMushlitz ; Capwell, Clark; Chase Kinard; Chris Hille; Chris Peha; Craig Chatterton; Cranford, Robert J.; Damien M. Williams; Dan Heart; Danny Stone; dools10@comcast.net; Doug Story ; efstoner; Elizabeth Hill; Evan Tuley; Hal Johnson; Hsieh, Roger K; Huotari,Jason J.; Jason Hill ; Jeff Abbott; Jerick Staker; Jesse; Jim Groth; Jim Soulia; John Fiorilla (WIMRY Lawyer); John Howell ; JVan@jag-transport.com; Kara Riebold; Karl Boehmke; Karl Webber; KayDee Gilkey; Kevin Burgess; Kurtis Lindsey; L. Carloye; Leslie Druffel; Linda Becker; Maddie Farnsworth ; Marie Becker ; Matt Keelin; Matt Zarecor; Michelle Hennings (WAWG); Paintner, Phil R.; PaulDidelius ; Paul Katovich; Paul Weber; Pete Johnstone; Port of Royal; Rasmussen, Larry R.; Couch, Rebecca; Rich Wesson; Rob Coffman; Ryan Poe; Sean Crowe; Shawn O'Connell; shbhenning; Mader, Steve; Steve Salzman; Stevenson,Chad B.; Tera Holden ; Toby Van Altvorst; Tony Cox; Ty Jessup; Zachary Landrum
- Cc:
- Michelle Hennings; Caitlin E. Manell
Whitman County Room – 2714 N. Mayfair St., Spokane 99224
Meeting Agenda:
Agenda
- Call to Order & Introductions – Rail Authority
- Division Update –
Jason Biggs
- PCC Updates
– Ryan Ragaza-Bourassa
- PCC Operator updates
o
WER -
o
SS&P -
o
WATCO -
o
WIMRY -
- 2022 CRISI Phase II Grant
- CW Branch – Cheney to Davenport ($30M)
- Construction update – Martinus is undercutting, replacing walkway ballast, installing and surfacing switches. Expected to complete track work by the end
of May and punchlist items by mid-June.
- P&L Branch – Marshall to Garfield ($26M)
- Construction update – Railworks was awarded the contract with construction starting the
end of May.
- PV Hooper – Hooper to Winona/Winona to St. John ($56M)
- Contract plans and special provisions are at 60%.
- Ad Date - November 2, 2026
- 2024 CRISI Phase III: CW Branch – Davenport to Wilbur ($58M)
- Funding – WSDOT $20.3M/Fed $37.7M
- Expecting to have an executed contract with FRA by the end of July.
- 2026 CRISI Phase IV: CW Branch – Wilbur to Hanson ($45M)
- Funding – WSDOT $22.5M/Fed $22.5M
- Working with our consultant, and the application is due June 22nd
- Capital Improvement Project Delivery Plan
- 2023-2025 FRAP Project
- SS&P FRAP- Oaksdale to Fallon
- Work started in July 2024 and includes 8,400 tie replacements, ballast distribution, and SLD between Oakesdale to Fallon.
- Remaining 3,000 ties and SLD will be installed in July/August.
- 2025-2027 FRAP Projects
- HighLine Grain Growers (WSDOT $1.2M/HighLine $3.1M)
- Upgrade Hartline loadout facility, purchase a trackmobile, and improving and and increasing storage on the siding track with 100 lb rail.
- Construction update – Two grain bins, scale building, drive pit, and leg tower construction is complete. Currently installing the conveyance equipment. Once
the west end of the track work is completed, Railworks will move to install the east end rail connection and finish the project with ballast distribution and surfacing.
- Pacific Northwest Farmer’s Cooperative (WSDOT $2.9M/PNW $ 9.6M)
- Site grading to construct a Hoop House to increase storage and continued development of the McCoy Terminal. The grading will accommodate 2 future Hoop Houses.
Each Hoop House can store 3M bushels of grain.
- Agreement is close to being executed.
- 2027-2029 FRIB/FRAP Call for Projects
- Announcedon Memorial Day (May 25th)- $ 7M available
- Applications will be due on Labor Day (Sept. 7th)
- Coulee Hite Rd. Rail Crossing and Signal Safety Project
- Spokane County is administering this Section 130 funded project
- Bid opening is tomorrow
- Construction will accommodate the 2026 harvest season.
- LaCrosse Bunkhouse Property Disposal (LaCrosse Community Pride)
- Port of Whitman has signed the deed. Once WSDOT records the deed, the property is officially transferred to the Port.
- Shawnee Bridge Fire Insurance Claim (9/10/26)
- WSDOT Risk Management and Legal Council is in the process of negotiating a fair settlement.
- Open Discussion –
All
- Adjourn – Next meeting is July 15th from 1-2 pm at Lincoln
County Commissioner’s Chambers
________________________________________________________________________________
Microsoft Teams meeting
Join:
https://teams.microsoft.com/meet/297800808641011?p=l5zVLqm51aLKIZa4vx
Meeting ID:
297 800 808 641 011
Passcode:
7cq9pC3B
Need help?
|
System reference
Dial in by phone
+1 206-531-0324,,655288087#
United States, Seattle
Find a local number
Phone conference ID:
655 288 087#
For organizers:
Meeting
options |
Reset dial-in PIN
________________________________________________________________________________
Attachments
Loading community reactions…